LED Video Wall Installation in Malaysia: Site Checklist
Check the room before approving an LED wall order. The display, mounting arrangement and service space need to fit the way the office uses the area.

Measure the working space
Record the wall dimensions, nearby doors, reception furniture and audience positions. Show the proposed outline to the people who use the room. Ask the installer to confirm mounting requirements and access needed for the selected configuration.
Trace every connection
List the computers and sources that will feed the display. Ask where the controller, cables and controls will sit. Have the installer document the proposed arrangement and identify any building work that needs to happen before delivery.
Agree on handover tasks
Include a demonstration with the office’s own content, source switching and the normal shutdown process. Ask for a simple operating guide and a fault-reporting contact. Attach room photos and measurements to the DUVIX enquiry so the quotation reflects the actual site.
Explore DUVIX LED displays · Request a quote
What to check before requesting a quote
Confirm on the site walk that technicians can reach service panels and that the quote specifies the handover test.